Design/Build on the Rise
By Tom Wood, Senior Project Manager, Knutson Construction
Services
There is a medley of project delivery systems used by owners
today in addition to the traditional method of competitive
bidding. No one method is best for every project, however,
one approach is gaining momentum across the country –
Design/Build.
The percentage of Design/Build projects is on the rise.
In fact, Engineering News Record recently reported that
by the year 2015, 55 percent of developments are projected
to be Design/Build, while 35 percent will be design-bid-build.
This statistic is not surprising. Many owners are realizing
the advantages of Design/Build, including:
- Shorter, More Concise Schedules
- A Team Manages the Owner’s Expectations
- High Quality Results
- Ability to Design to the Price, Not Price to the Design
- Minimizes Change Orders
With Design/Build, the architect and general contractor
work together as a single entity to provide both design
and construction of a project. This team approach allows
the designer to be part of the construction entity, and
eliminates redundancy in the proposal and bidding procedures,
which is typical in the traditional design-bid-build process.
Additionally, fewer lawsuits, and a convenient one-point-of-responsibility
encourage some owners to opt for Design/Build.
Advantages of Design/Build
- Shorter, More Concise Schedules
Since the design is often based on the availability of
materials, equipment and labor, schedules tend to be more
efficient.
Many projects have reduced their construction time by
more than one-third. Less than two months after being
selected as design/build manager for Treasure Island Resort
& Casino in Red Wing, Minnesota, Knutson started construction.
Within six months, Treasure Island opened the first three
floors of the hotel. The entire seven-story facility was
complete in another three months — on time and under
budget. As a result of exhaustive planning and teamwork,
Knutson met the fast-tracked, 11-month completion goal.
How is this possible? The overlapping phases of Design/Build
allow portions of the work to begin immediately after
the design is approved. This shortens the schedule by
several weeks, and often times, by months. These time
efficiencies translate into substantial cost savings,
so owners begin generating revenue sooner than they would
have with the competitive bid process.
As an added bonus, delays due to disputes are minimized
and allow the project to move forward with streamline
consistency.
- Team Manages the Owner’s Expectations
It’s important that the team not only “manage”
but also “understand” the owner’s expectations.
You may have heard the “Porsche/Volkswagen”
analogy. A specification comparison was done using a Porsche
and a Volkswagen. Each specification on the list was nearly
identical, except for the engine. Yet, on paper, it looked
as though they could be the same vehicle. However, we
all know that a Volkswagen costs considerably less than
a Porsche.
Unfortunately, similar situations have occurred in the
construction industry. An owner envisioned and expected
the end result to be that of a Porsche, but what actually
got built was a Volkswagen.
Therefore, it is important to truly understand the owner’s
expectations and cost limitations – to deliver the
highest quality development at the best price (within
the owner’s budget), and without any surprises.
- High Quality
In the Design/Build process, quality is top of mind for
the entire team. Because the partnership is solidified
from the very beginning, the owner’s best interest
and priorities are shared with the entire team from the
start.
Additionally, Design/Build motivates subcontractors to
maximize quality, and gives the general contractor more
flexibility when selecting specialists.
- We Can Design to the Price, Not Price to the
Design
Instead of the architect designing a building first, and
then the contractor coming in later, the two entities
are working as one from the inception of the project.
Specifications can be discussed and strategized as a team
in an effort to complement the budget and stay within
the monetary guidelines.
- Minimizes Change Orders
Nobody likes change orders. Because good communication
is the catalyst in a Design/Build project, change orders
are kept to a minimum. Additionally, it helps when the
owner provides a detailed, prioritized list of criteria
up front. Because the architect and contractor are working
together from the inception of the project, they are able
to avoid surprises mid-project.
While Design/Build simplifies the process in many types
of projects and saves valuable time, it can raise challenges
for owner’s who are used to developing a project
in the traditional manner of design-bid-build.
Challenges of Design/Build
- Developing High Level of Trust
Owners must have a high level of trust in the team they
select. While design and construction professionals have
worked together for years, it is especially helpful with
Design/Build projects for these two entities to have worked
together previously as a team to help ensure the success
of the project.
- Change is difficult.
Eliminating the traditional “bid” portion
of the process is hard for many owners. However, if a
project is cost-driven, the owner often sacrifices long-term
quality for short-term cost issues.
A Different Way of Thinking
While many owners are nervous about removing the bid factor,
there is a learning process going on within the industry.
Competitive bidding is not necessarily the best way to generate
the best value or even the lowest cost. In a Design/Build
situation the contractor and designer are often in a position
to save the owner money, not cost him, by identifying changes
and cost saving opportunities before the project begins.
Even government agencies are beginning to change policies
requiring low bids to give them a Design/Build option.
“The Public Sector is quickly catching on to Design/Build
because it is an effective way to get their project designed
and built in a time and cost efficient manner,” commented
Michael Collins, a Senior Designer with GDS Architects in
Pasadena, California.
For example, in Southern California, there is a classroom
shortage prompting an immediate need to build more schools
faster. Recently, California Governor, Gray Davis, signed
new legislation allowing school districts across the state
to utilize Design/Build for new construction projects exceeding
$10 million. According to Design-Build Magazine, many of
the 700 schools expected to be built in California over
the next six years could qualify for this new option.
For school districts faced with the need to build more schools
quickly, the Design/Build legislation could be very useful
in attracting a top-quality contractor and achieving a cost
effective, organized project.
The Wave of the Future
More and more college students are aware of the increase
in Design/Build projects and are tailoring their education
programs accordingly.
According to Dean Tom Fisher, College of Architecture and
Landscape Architecture, University of Minnesota, "Many
of our students recognize that Design/Build is the future
of alternative delivery methods. They are getting an undergraduate
degree in construction management and then go onto get a
graduate degree in architecture. They come out of school
with a strong blend of both construction and design with
the idea of opening more integrated design/build organizations."
Knutson Construction – A Natural Fit
Knutson Construction started out in 1911 as a Master Builder,
providing a full scope of building services – from
design to pre-construction to general contracting.
To this day, Knutson remains true to its roots as a Master
Builder offering a wide range of services
and project delivery systems, including Design/Build.
For
any questions, regarding Design/Build or our experience
with this approach, please contact Tom Wood in Minneapolis,
twood@knutsonconstruction.com