Water and Wastewater Treatment

Water Reclamation Plant

01 12
Owner
City of Rochester
Architect
RSP Architects
Service
Construction Manager, Construction Manager at Risk
City
Rochester, Minnesota
Size
35,000 SF
Year
2021

This $12.5 project includes remodeling 35,000 square feet of the old treatment plant and turning it into a new storage, offices, locker rooms, and meeting spaces. The project includes new windows, new roofs, a new elevator/stairway, and a new 3600 square foot breakroom/training room. The project also included a 30,000 square foot pre-engineered metal building that required approximately 20,000 Cubic Yard soil correction as the location for the new storage building was an old landfill.

Fun Fact: The team placed around 400 yards of flowable fill to seal off existing abandoned tanks.